EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
Voltar-S21
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (835)
Research
- (9)
Workshop
- (16)
Empennage
- (6)
Fuselage
- (182)
-
Wing Cuffs
-
Wing Cuffs
-
Windshield Cuffs
-
Windshield
-
Windshield Hold-Down
-
Windshield Fitting
-
Skylight Drilling
-
Canopy Ribs
-
Priming Canopy
-
Primer Prep
-
Skylight Ribs, Spinner
-
Skylight Ribs
-
Skylight Ribs
-
Skylight install
-
Oil Door
-
Cowling Work
-
Fairings and Cowling
-
Cowling
-
Boot Cowl Rivering
-
Coanda Fairing
-
Nutplates and Paint
-
Bottom Fairings
-
Bottom Fairings
-
Fuselage Bottom...
-
Firewall Exit Fairing
-
Exit Fairing
-
Aft Baggage
-
Brakes and Fuel Shutoff
-
Rerigging Cabin Heat
-
Cabin Heat Box
-
Interior Stuff
-
Shunt, Vents, Static
-
NACA ducts and...
-
Door Sealing
-
Door Latch
-
Door Latch (Original...
-
Door Latches
-
Door Latches
-
Door Riveting
-
Rigging Parking Brake
-
Door Riveting
-
Door Final Assembly
-
Priming
-
Door Paint Prep
-
Drilled for Tinnermans
-
Door Hanging
-
Door Fabrication
-
Door Install
-
Door Fabrication
-
Door Fitup
-
Door Fabrication
-
Doors
-
Completed Flap Lever...
-
Flap Actuator Housing
-
Flap Lever Housing
-
Foward Baggage and...
-
Forward Baggage...
-
Forward Baggage Floor
-
Forward Baggage Floor
-
Priming
-
Master Contactor
-
Battery Install
-
Floor Boards
-
Floor boards
-
Fuel Lines
-
Prepping battery box
-
Installing fuel pump...
-
Drilling firewall
-
Installing header...
-
Fitting header tank
-
Pepping and priming
-
Header tank fit up
-
Mounting Header Tank
-
3/5
-
Rerouting brake lines
-
Brake lines and seats
-
Brake master...
-
Parking brake install
-
Rudder pedal rigging
-
Rigging rudder pedals
-
Rigging rudder pedals
-
Deburring and pedal...
-
Rudder pedal sssembly
-
Floorboard
-
Installing platenuts
-
Deburring and floor...
-
Deburring
-
Inventory
-
Inventory
-
Deburring
-
Inventory
-
Deburring interior...
-
Cleanup
-
Cleanup
-
Boot Cowl cleanup
-
Up-drilling firewall
-
Fabricated Cowl...
-
Trimming boot cowl...
-
Trimming and...
-
Drilling Boot Cowl
-
Fitting boot cowl
-
Boot Cowl Asembly
-
Drilling side skins...
-
Fitting Boot Cowl
-
Fitting boot cowl
-
Fitting Firewall
-
Firewall
-
Riveting fuse.
-
Drilling cage side...
-
C-GJVL
-
Flipped fuse
-
Drilled cage side...
-
Fussing with side...
-
Attached seat rails
-
Drilling bottom cage...
-
Flipped the fuse
-
Completed tail cone...
-
Riveting fuselage
-
Riveting fuselage
-
Riveting fuselage
-
Riveting fuselage
-
Marking rivets
-
Assembling Sawhorses
-
Riveting Tail Cone
-
Finalizing tail cone...
-
Finalizing upper...
-
Drilling for...
-
Top forward stiffeners
-
Bending stiffeners
-
Match drilling...
-
Mounting forward...
-
Fitting top tailcone...
-
S4 Closeout
-
S4 close out
-
Clecoeing tailcone
-
Wiring and bolting
-
Trimming top fuse...
-
Frustration
-
Baggage floor
-
Fitting baggage floor
-
Trimming baggage...
-
Fitting baggage...
-
Finalized aft rudder...
-
Fuselage angle...
-
Fuselage angle braces
-
Tail Cone Attachment
-
Skin Doubler shim...
-
Tail Cone Attach
-
Connecting Cage to...
-
Fuselage Riveting
-
Fuselage Riveting
-
Riveting and...
-
Riveting stiffeners...
-
Fuse Stringers
-
Tailcone Bottom
-
Riveting Bulkhead...
-
Preparing Bulkheads
-
Priming Fuse skins
-
Scuffing and...
-
Drilling new rudder...
-
Organizing parts for...
-
Scrubbing and Priming
-
Shooting Primer
-
Scrubbing Parts
-
Priming
-
Prepping For Priming
-
Shooting Primer
-
Prepping parts for...
-
Primed Elevator Pushrod
-
Shooting Primer
-
Primer Prep
-
Removing labels and...
-
Deburring Fuse parts.
-
Deburring Fuse and...
-
Deburring Fuse and...
-
Deburring Fuse and...
-
Deburring Fuse parts
-
Deburring Fuse parts
-
Deburring Fuse parts
-
Deburring Fuse parts
Firewall
- (19)
Tail Feathers
- (70)
Wings
- (191)
Controls
- (9)
Avionics
- (105)
Lighting
- (3)
Instrument Panel
- (72)
Landing Gear
- (11)
Engine
- (93)
Propeller
- (5)
Fuel System
- (6)
Interior Finish
- (35)
Paint / Decals
Inspection
- (2)
Tools
Suggestions
- (1)
Builder Name:
Vern Little
-
Project:
Rans - S-21 Outbound
-
VIEW REPORTS
Total Hours:
2341.9
Start/Last Date:
Mar 06, 2018 - No Finish Date
Friendly URL:
https://eaabuilderslog.org?s=Voltar-S21
Home or Last Project Picture
Oct 26, 2020
Fuselage Riveting
- (8 hours)
Category: Fuselage
Riveted side skins to bulkheads. Flipped canoe onto workbench and lined up cage. Trimmed center longerons to 4.2" from last forward holes. Dave W. 3.5 hrs.
When I started building airplanes, I had brown hair and a red moustache. What happened?
52548CAD-5D26-4CBB-8F7C-DB6C477980BC.jpeg
BE8AE390-09E5-4805-8492-EB0513379DBC.jpeg
E86B56D1-834F-4550-A173-EEB00C0C93E1.jpeg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.